Evaluation reports are either openly accessible via pdf download, or accessible via MSF's internal Sharepoint, which is mainly due to the sensitive nature of the operational contexts and resulting content. However, there are ongoing discussions about making all evaluation reports publicly searchable. If you are an MSF association member, reports are made available on various associate platforms such as www.insideOCB.com.

Country/Region

C

Following the earthquake in 2010 and the emergency response that ensued, MSF-OCG took the decision to invest in a hospital in the Leogane area that was for several years the biggest hospital managed by MSF-OCG. Given that for the last three years this was the only MSF-OCG project in the country, that the capital is located only two hours from the hospital and that there is a strategic ambition within MSF-OCG to review mission set-ups, OCG and the field teams determined that 2013 was an opportune time to review the Haiti mission.

Annie Desilets
01/11/2014

Following the devastating earthquake in Haiti in January 2010, MSF’s Committee of Executive Directors decided to conduct a global review of MSF’s response to the disaster. This exercise covered the interventions of the five operational centres and consisted of six specific reviews looking at the different axes of the response: global/operational, medical/surgical, logistic/supply, communication, human resources and fund raising. An intended inter-sectional finance review and/or audit did not take place. Evaluators consider this the biggest limitation of this review exercise.

This evaluation was conducted by Francis Coteur (Logistics), Luis Encinas (Medical/Patient perception), Amaia Esparza (Communications), Paula Frankema (Global/Operations), Karine Klein (Fundraising), Laura Kopczak (Supply), Juli Niebuhr (Human Resources), Roger Teck (Medical), Johan von Schreeb (Medical/Surgical), Sabine Kampmüller (Process facilitation, Executive report), Ewald Stals (Team Leader) on behalf of the MSF Vienna Evaluation Unit.
12/04/2010

Following the earthquake in 2010 and the emergency response that ensued, MSF-OCG took the decision to invest in a hospital in the Leogane area that was for several years the biggest hospital managed by MSF-OCG. Given that for the last three years this was the only MSF-OCG project in the country, that the capital is located only two hours from the hospital and that there is a strategic ambition within MSF-OCG to review mission set-ups, OCG and the field teams determined that 2013 was an opportune time to review the Haiti mission.

Annie Desilets
01/11/2014

In September 2009, MSF carried out an assessment of two of its former projects in Karuzi (OCB) and Kinyinya (OCA), Burundi. These two projects were handed over to MOH in 2007 with significant investment from MSF in the handover processes. Following reports of the breakdown of healthcare after MSF’s departure and criticism on the way the handover of these two projects was managed, MSF wanted to assess the current situation in the two sites and document which, if any, handover strategies were successful and led to the continuation of MSF activities.

Frédérique Ponsar and Annie Désilets
27/11/2009

This report summarises the key lessons learned from MSF's cholera interventions in Zambia 2004, 2006, 2008, 2010 (OCBA), Guinea Bissau 2005-2008 (OCBA), Juba 2006 (OCBA), Haiti 2010-2011 (OCBA), Angola 2006 (OCB, OCA, OCBA), Zimbabwe 2009 (OCB, OCA, OCBA)

M Iscla
09/05/2012

This evaluation contributes to the debate around the OCB Martissant intervention following the proposed closure and resulting decision to scale down in 2013. The report concludes that the context remains similar to that of the beginning therefore the intervention is still as relevant as it was in 2006 however the evaluation questions the suitability of OCB's country wide strategy in Haiti, urging a focus towards the most vulnerable and marginalised urban populations, rather than towards the general needs of the population.

Stockholm Evaluation Unit
01/10/2013

In the last few years, MSF OCG has developed an Operational Policy with the ambition to increase and improve the quantity and quality of secondary health care structures (or inpatient care). This recognition has prompted the organization to take a closer look at the challenges, lessons and accomplishments in terms of hospital management to develop strategies that will enable the organization to successfully set up, govern, implement and exit inpatient projects in all types of contexts.

This publication was produced at the request of MSF OCG, under the management of the Vienna Evaluation Unit. It was prepared independently by Annie Désilets and Ines Hake.
28/03/2017

Au cours des dernières années, MSF-OCG a élaboré une politique opérationnelle avec l'ambition d'augmenter et d'améliorer la quantité et la qualité des structures de soins secondaires (ou soins hospitaliers). Cette situation a incité MSF à examiner de plus près les défis, les enseignements et les réalisations en matière de gestion hospitalière afin d'élaborer des stratégies gagnantes pour le démarrage, l'opération et la fermeture de projets pour patients hospitalisés, dans tous les types de contextes.

This publication was produced at the request of MSF OCG, under the management of the Vienna Evaluation Unit. It was prepared independently by Annie Désilets and Ines Hake.
09/10/2017

OCB has undertaken to learn from its emergency intervention to support the victims of Hurricane Matthew, during which it experienced difficulties providing shelter and reconstruction relief. The aim is to evaluate the distribution of reconstruction materials in remote and hard to reach areas covering the entire duration and geographical area; Grand’Anse and Sud Department from 6 October 2016 to 20 February 2017.

This publication was produced at the request of MSF OCB, under the management of the Stockholm Evaluation Unit. It was prepared independently by Malik Allaouna and Simon Deprez.
19/09/2017