Evaluation reports are either openly accessible via pdf download, or accessible via MSF's internal Sharepoint, which is mainly due to the sensitive nature of the operational contexts and resulting content. However, there are ongoing discussions about making all evaluation reports publicly searchable. If you are an MSF association member, reports are made available on various associate platforms such as www.insideOCB.com.

Country/Region

C

Through an analysis of the events that have marked MSF’s history since 2003, this series of case studies and historical accounts describes the evolution of MSF's humanitarian ambitions, the resistance to these ambitions and the political arrangements that overcame this resistance (or that failed to do so).

edited by Claire Magone, Michaël Neuman, Fabrice Weissman
22/11/2011

The evaluation looks at the process for managing MSF-OCP's construction/rehabilitation projects since 2012. The main problems identified are not related to the process itself, but the way it is put into application. The main users pointed out the long delays (periods of indicision) as being the biggest difficulty, followed by budget/cost issues (cost/m² estimates) , and the quality of constructions (techniques, materials, etc). One of the root causes of delays relates to unclear/incomplete definition of roles and responsibilities = actions to take.

Nicolas Bérubé & Vincent Brown
16/07/2015

Full version and short version available. This evaluation of the viral load (VL) monitoring system was commissioned in order to more fully understand the experience and outcomes of the introduction and scale-up of VL in one district of Zimbabwe but also undertaken with a view to the national scale-up of VL monitoring, and the general issue of VL monitoring in sub-Saharan Africa in light of the UNAIDS 90-90-90 targets. The report details five clear recommendations to reach undetectable viral load.

This publication was produced at the request of MSF OCB, under the management of the Stockholm Evaluation Unit. It was prepared independently by Richard Bedell.
21/04/2016

This report summarises the key lessons learned from MSF's cholera interventions in Zambia 2004, 2006, 2008, 2010 (OCBA), Guinea Bissau 2005-2008 (OCBA), Juba 2006 (OCBA), Haiti 2010-2011 (OCBA), Angola 2006 (OCB, OCA, OCBA), Zimbabwe 2009 (OCB, OCA, OCBA)

M Iscla
09/05/2012

Optimizing HIV, TB and NCD treatment in five sub-saharan countries.

This publication was produced at the request of MSF OCB, under the management of the Stockholm Evaluation Unit. It was prepared independently by Catherine Lalonde and Joost van der Meer.
12/02/2018

RIDER, CRASH and Epicentre have finalized a critical review of the operations of MSF France in Borno, Nigeria, from 2015 to 2016.

***English and French version available***

This publication was produced by RIDER, CRASH and Epicentre.
01/03/2019

Since 2012 MSF-OCA has been implementing a new approach to HIV/TB programming in two projects in Zimbabwe: Gokwe North district and City of Harare polyclinics. In September 2014, towards the end of their operation, an evaluation was commissioned to the Vienna Evaluation Unit with the objective to examine the intended goals, outcomes (including the standards of quality) and implementation process of the projects.

Mzia Turashvili
01/11/2014

This evaluation was commissioned with the objective to enhance future operational performance by means of lessons learned from the intervention in Hajjah Governorate from 30 March to October 2017 in order to reduce morbidity and mortality caused by cholera outbreaks in similarly complex settings. Evaluation findings showed that the intervention contributed to reduce morbidity, mortality and human suffering, even though data collection was chaotic in the beginning.

This publication was produced at the request of MSF OCBA, under the management of the Vienna Evaluation Unit. It was prepared independently by François Grünewald and Dr Paula Farias.
26/09/2018

Best practices, challenges and lessons learned from the HIV/AIDS programme in Tsholotsho, with main purpose to improve project implementation amd decision making in future projects.

Eleonora Aralla and Johan de Smedt
01/04/2013

Pages