Evaluation reports are either openly accessible via pdf download, or accessible via MSF's internal Sharepoint, which is mainly due to the sensitive nature of the operational contexts and resulting content. However, there are ongoing discussions about making all evaluation reports publicly searchable. If you are an MSF association member, reports are made available on various associate platforms such as www.insideOCB.com.

Topic

Country/Region

C

Through an analysis of the events that have marked MSF’s history since 2003, this series of case studies and historical accounts describes the evolution of MSF's humanitarian ambitions, the resistance to these ambitions and the political arrangements that overcame this resistance (or that failed to do so).

edited by Claire Magone, Michaël Neuman, Fabrice Weissman
22/11/2011

The evaluation looks at the process for managing MSF-OCP's construction/rehabilitation projects since 2012. The main problems identified are not related to the process itself, but the way it is put into application. The main users pointed out the long delays (periods of indicision) as being the biggest difficulty, followed by budget/cost issues (cost/m² estimates) , and the quality of constructions (techniques, materials, etc). One of the root causes of delays relates to unclear/incomplete definition of roles and responsibilities = actions to take.

Nicolas Bérubé & Vincent Brown
16/07/2015

Full version and short version available. This evaluation of the viral load (VL) monitoring system was commissioned in order to more fully understand the experience and outcomes of the introduction and scale-up of VL in one district of Zimbabwe but also undertaken with a view to the national scale-up of VL monitoring, and the general issue of VL monitoring in sub-Saharan Africa in light of the UNAIDS 90-90-90 targets. The report details five clear recommendations to reach undetectable viral load.

This publication was produced at the request of MSF OCB, under the management of the Stockholm Evaluation Unit. It was prepared independently by Richard Bedell.
21/04/2016

The hand over of MSF-F Phnom Penh HIV project is a complex process. This HIV cohort is the biggest of MSF OCP to be handed over so far and the hand over is almost directly done to the national health authorities, NGO partners having been identified only for minor parts of the project. In the first part of the report, a narrative description and an evaluation of the main technical aspects of the handover process are presented.

Cristina Orlandini
01/04/2010

This report summarises the key lessons learned from MSF's cholera interventions in Zambia 2004, 2006, 2008, 2010 (OCBA), Guinea Bissau 2005-2008 (OCBA), Juba 2006 (OCBA), Haiti 2010-2011 (OCBA), Angola 2006 (OCB, OCA, OCBA), Zimbabwe 2009 (OCB, OCA, OCBA)

M Iscla
09/05/2012

The purpose of this evaluation was to assess the choices in and the approach of the current primary health care (PHC) projects implemented by Médecins Sans Frontières (MSF) in Peru within the framework of the changing socio-political situation in Peru. This evaluation served to document lessons learned which may feed into future decisions on the direction for policy and planning of MSF in Peru.

Jansen, H.
01/12/1998

Optimizing HIV, TB and NCD treatment in five sub-saharan countries.

This publication was produced at the request of MSF OCB, under the management of the Stockholm Evaluation Unit. It was prepared independently by Catherine Lalonde and Joost van der Meer.
12/02/2018

RIDER, CRASH and Epicentre have finalized a critical review of the operations of MSF France in Borno, Nigeria, from 2015 to 2016.

***English and French version available***

This publication was produced by RIDER, CRASH and Epicentre.
01/03/2019

This document describes the Lessons identified during the emergency phase of the MSF Sweden (MSFSE) response to the November 2013 Philippines Disaster. It summarises the successes and challenges encountered during the process, lists the important learning themes arising from these successes and challenges, and includes a set of lessons derived from an analysis of these learning themes.

Full Report

This Retrospect was facilitated by the Stockholm Evaluation Unit on behalf of the Project Team. The report has been prepared by Timothy McCann.
12/07/2019