Photos: 

Evaluation reports are either openly accessible via pdf download, or accessible via MSF's internal Sharepoint, which is mainly due to the sensitive nature of the operational contexts and resulting content. However, there are ongoing discussions about making all evaluation reports publicly searchable. If you are an MSF association member, reports are made available on various associate platforms such as www.insideOCB.com.

This report examines the case study of Decentralised Models of Care (DMC) implemented in the MSF Operational Centre Barcelona (OCBA) Kabo project in Central African Republic (CAR).

Heidi Becher, Pilar Duch and Mathias Altmann
17/09/2020

In 2015, MSF operations and medical directors recognised antibiotic resistance (ABR) as a priority and called for the elaboration of an intersectional roadmap to tackle ABR in MSF projects. The MSF ABR Task Force was consolidated in 2017 with joint medical and operational governance.

These case study reports were produced at the request of MSF-OCBA, under the management of the Vienna Evaluation Unit. They were prepared independently by the respective authors.
09/09/2019

In CAR, MSF’s medical presence finds itself unprecedentedly in the midst of a health desert. MSF intervenes in CAR to provide access to health to populations affected by the conflict in the North. Within this context, 3 MSF sections (MSF-OCBA, OCA, OCP) in CAR since 2006 requested an evaluation of their hospital-based projects. This work involves the comparison of the three projects (hospital + outreach activities) and the analysis of factors in the face of a potential handover to the MoH or other actors present in the area.

Isabelle Voiret and Vincent Brown
20/12/2011

Zahedan Project for Afghan refugees in Iran : 1st a necessary historical review; and an analysis of the political and technical relevance of the project (10 years). MSF could have proposed earlier health activities directly oriented for local Iraniens. The adequacy of means related to project objectives is considered satisfactory.

Tommaso Fabbri & Vincent Brown
01/04/2011