Photos: 

Evaluation reports are either openly accessible via pdf download, or accessible via MSF's internal Sharepoint, which is mainly due to the sensitive nature of the operational contexts and resulting content. However, there are ongoing discussions about making all evaluation reports publicly searchable. If you are an MSF association member, reports are made available on various associate platforms such as www.insideOCB.com.

Country/Region

C

Through an analysis of the events that have marked MSF’s history since 2003, this series of case studies and historical accounts describes the evolution of MSF's humanitarian ambitions, the resistance to these ambitions and the political arrangements that overcame this resistance (or that failed to do so).

edited by Claire Magone, Michaël Neuman, Fabrice Weissman
22/11/2011

After 15 years of presence in Myanmar, an evaluation was conducted to highlight some of the challenges relating to the context and the lessons learned

Dan Sermand and Dr Jean-Clément Cabrol
20/09/2008

This evaluation is an end of project cycle evaluation. The main purposes, as with all evaluations in MSF-H, are learning and accountability. While the project was initiated with a three year time line, certain activities may continue for the coming two years. The conclusions and results of this evaluation will be used as a guide for future medical programming.

Cunningham, D.
01/04/2000

After seven years of existence and shortly before its closure, Cell 2 and the Direction of Operations launched a lessons-learned exercise of the Cardiovascular Emergency Project set at Hospital No. 9 in Grozny, Chechnya. The objective of this review was to relate the main steps and lessons of this so-called "atypical" medical project, at least in the light of MSF's experience, mobilizing a high-tech clinical expertise such as thrombolysis and angiography.

***English and French version available***

This publication was produced by MSF OCP, Cell2, in cooperation with RIDER.
01/03/2019

This document describes the Lessons identified during the emergency phase of the OCA Rakhine intervention. It summarises the successes and challenges encountered during the project, lists the important learning themes arising from these successes and challenges, and includes a set of lessons derived from an analysis of these learning points.

Stockholm Evaluation Unit
11/10/2012

The objective of this lessons learnt exercise was to assess the advantages and disadvantages of the UNITAID grant governance and management model for project achievements in terms of medical (and related) outcomes, strategic decisions, the potential for collaboration between multiple MSF entities and to leverage the learnings for replication in future projects. The exercise showed that the project directly delivered a new, more effective, simpler and much cheaper treatment to patients across seven countries.

This publication was produced at the request of MSF OCG, under the management of the Vienna Evaluation Unit. It was prepared independently by Hugues Juillerat, Sharon McClenaghan and Glenn O’Neil of TRAASS International.
15/01/2019

This document describes the project Lessons identified at the end of the market entry planning phase for MSF in Finland. It summarises the successes and challenges encountered during the project, lists the learning themes arising from these successes and challenges, and includes a set of lessons derived from an analysis of these learning points. The Annex contains a proposed (brief) framework with criteria and pre-requisites for a successful Market Entry Plan in MSF based on this experience. NOTE: This is not an evaluation and therefore there is no ambition for independent judgement.

This Retrospect was facilitated by the Stockholm Evaluation Unit on behalf of the Project Team. The report has been prepared by Timothy McCann.
30/10/2017

The overall objective of the evaluation is to identify and describe factors and issues to consider when planning implementation or continuation of Remote Control Programmes (RCPs) as an alternative to cancelling Médecins Sans Frontières (MSF) programme implementation in a particular region/ country.

Martin Braaksma and Mzia Turashvili
01/06/2009

Cyclone Nargis was a strong tropical cyclone that caused the worst natural disaster in the recorded history of Myanmar. An MSF intervention started 72 hours after the disaster with two teams, one in Bogalay and one in Pyapon. Due to political restrictions the real operational activities only started 10 days after. MSF-CH wanted to capture the lessons learned out of this major response that was considered a successful intervention.

admin
13/01/2009

Zahedan Project for Afghan refugees in Iran : 1st a necessary historical review; and an analysis of the political and technical relevance of the project (10 years). MSF could have proposed earlier health activities directly oriented for local Iraniens. The adequacy of means related to project objectives is considered satisfactory.

Tommaso Fabbri & Vincent Brown
01/04/2011

Pages