Photos: 

Evaluation reports are either openly accessible via pdf download, or accessible via MSF's internal Sharepoint, which is mainly due to the sensitive nature of the operational contexts and resulting content. However, there are ongoing discussions about making all evaluation reports publicly searchable. If you are an MSF association member, reports are made available on various associate platforms such as www.insideOCB.com.

Country/Region

C

Through an analysis of the events that have marked MSF’s history since 2003, this series of case studies and historical accounts describes the evolution of MSF's humanitarian ambitions, the resistance to these ambitions and the political arrangements that overcame this resistance (or that failed to do so).

edited by Claire Magone, Michaël Neuman, Fabrice Weissman
22/11/2011

The evaluation looks at the process for managing MSF-OCP's construction/rehabilitation projects since 2012. The main problems identified are not related to the process itself, but the way it is put into application. The main users pointed out the long delays (periods of indicision) as being the biggest difficulty, followed by budget/cost issues (cost/m² estimates) , and the quality of constructions (techniques, materials, etc). One of the root causes of delays relates to unclear/incomplete definition of roles and responsibilities = actions to take.

Nicolas Bérubé & Vincent Brown
16/07/2015

2005 was marked by two major natural calamities, the tsunami waves in South East Asia and the earthquake in Kashmir, Pakistan. Both of them were followed by a large intervention of MSF. After the initial assessment, MSF Belgium concentrated his efforts on the district of Bagh. The report will focus on the first 3 months of the intervention. As only a few documents are available, it was requested to reconstitute a chronology of intervention. Secondly, when there was time available, a short description and appreciation of the interventions of the other MSF sections was asked.

William Claus
01/04/2006

In September 2009, MSF carried out an assessment of two of its former projects in Karuzi (OCB) and Kinyinya (OCA), Burundi. These two projects were handed over to MOH in 2007 with significant investment from MSF in the handover processes. Following reports of the breakdown of healthcare after MSF’s departure and criticism on the way the handover of these two projects was managed, MSF wanted to assess the current situation in the two sites and document which, if any, handover strategies were successful and led to the continuation of MSF activities.

Frédérique Ponsar and Annie Désilets
27/11/2009

 

French report. MSF restarted the activities of the General Reference Hospital in Man in 2003 in order to deliver primary and secondary health care. As well as providing medcidines and medical/surgical material, MSF also provided medical, para-medical, and HR staff to support the hospital. A therapeutic nutrition centre was also opened. MSF also managed 2 other regional hospitals. This evaluation examined the effectiveness and appropriateness of the services provided by MSF.

Marie-Eve Burny
08/03/2006

RIDER, CRASH and Epicentre have finalized a critical review of the operations of MSF France in Borno, Nigeria, from 2015 to 2016.

***English and French version available***

This publication was produced by RIDER, CRASH and Epicentre.
01/03/2019

This document describes the Lessons identified during the emergency phase of the MSF Sweden (MSFSE) response to the November 2013 Philippines Disaster. It summarises the successes and challenges encountered during the process, lists the important learning themes arising from these successes and challenges, and includes a set of lessons derived from an analysis of these learning themes.

Full Report

This Retrospect was facilitated by the Stockholm Evaluation Unit on behalf of the Project Team. The report has been prepared by Timothy McCann.
12/07/2019

This review of operational choices and decisions in Pakistan was carried out in 2011 and has now been produced in a shorter summary version. The report provides a historical overview of OCB presence in the country and looks at the way that the operational strategy developed over time, both in response to the external factors but also as OCB used a number of strategies to create an operational space. Many of the findings remain valid today within Pakistan and also in similar missions. A full version of the report is available from Stockholm Evaluation Unit.

Boris Stringer
01/09/2011

The objective of this lessons learnt exercise was to assess the advantages and disadvantages of the UNITAID grant governance and management model for project achievements in terms of medical (and related) outcomes, strategic decisions, the potential for collaboration between multiple MSF entities and to leverage the learnings for replication in future projects. The exercise showed that the project directly delivered a new, more effective, simpler and much cheaper treatment to patients across seven countries.

This publication was produced at the request of MSF OCG, under the management of the Vienna Evaluation Unit. It was prepared independently by Hugues Juillerat, Sharon McClenaghan and Glenn O’Neil of TRAASS International.
15/01/2019

Pages