Photos: 

Evaluation reports are either openly accessible via pdf download, or accessible via MSF's internal Sharepoint, which is mainly due to the sensitive nature of the operational contexts and resulting content. However, there are ongoing discussions about making all evaluation reports publicly searchable. If you are an MSF association member, reports are made available on various associate platforms such as www.insideOCB.com.

Country/Region

C

A series of failures was the starting point for this analysis. Several outbreaks of hepatitis E, transmitted via the water supply, occurred in refugee and IDP sites in the Sahel (Sudan in 2004, and Chad in 2007) and in central Africa (Central African Republic in 2002, and Uganda in 2007). MSF was responsible for all or part of the water supply, as well as medical care. These outbreaks are a reminder that significant infectious risks persists even after we implement our usual procedures.

Jean-Hervé Bradol, Francisco Diaz, Jérôme Léglise, Marc Le Pape
08/07/2015

Full version and short version available. This evaluation of the viral load (VL) monitoring system was commissioned in order to more fully understand the experience and outcomes of the introduction and scale-up of VL in one district of Zimbabwe but also undertaken with a view to the national scale-up of VL monitoring, and the general issue of VL monitoring in sub-Saharan Africa in light of the UNAIDS 90-90-90 targets. The report details five clear recommendations to reach undetectable viral load.

This publication was produced at the request of MSF OCB, under the management of the Stockholm Evaluation Unit. It was prepared independently by Richard Bedell.
21/04/2016

MSF is one of the pioneering organisations to implement HIV & AIDS related interventions including ART in different settings. Understandably, the organisation is thus often solicited to provide information on cost analysis of programs. This is the purpose of this study into 3 different MSF HIV/AIDS programs: Kenya, DRC and Malawi. The present study proposes a detailed description of the cost for the HIV/AIDS program in Thyolo in Malawi for the period of time from 2005 to 2007. The methodology used is inspired by the “Activity based costing” (ABC approach)

Guillaume Jouquet
01/06/2008

After an initial period of three years in Lesotho, MSF has decided to extend its presence in the country for two more years and to launch a second phase of the project primarily focused on intensifying the transfer of responsibility for the programme to local health authorities and partners. This is due partly to the administrative process now underway in Lesotho to decentralise to local government, coupled with related health sector reforms, which have divided the former catchment area of Scott Hospital Health Service Area into two districts with different management structures.

Guillaume Jouquet
01/07/2009

This evaluation is best understood as a peer review aimed at learning from the experiences of 3 different sections of MSF operating HIV/AIDS programmes in Malawi. Our aim was to evaluate how specific differences in objectives might impact on programme strategies and whether these differences would be relevant when assessing programme outcomes. The general issues of interest were decentralisation, simplification and task shifting in relation to the expansion of ART services.

Richard Bedell, Jean-Marc Biquet, Alexandra Calmy
01/05/2007

MSF's HIV/AIDS project in Thyolo district, Malawi was one of the MSF movement's earliest efforts to address HIV/AIDS in sub-Saharan Africa, beginning in 1997. The handover of project responsibilities from MSF Luxembourg to MSF Belgium took place in 2005. MSF Belgium agreed to undertake this external evaluation of the project with the goal of assessing the project's performance, identifying constraints preventing the achievement of its goals, and proposing recommendations to improve overall effectiveness.

David Evans
01/11/2007

French report. Le projet initial de MSF à Bongor était d'assurer la fonctionnalité correcte d'un centre de formation de Bongor pour la formation des médecins généralistes en chirurgie de base. Une des difficultés quant au déroulement harmonieux du projet était d'éviter d'avoir un service de chirurgie de haute qualité au sein de l'hôpital avec à côté des services de médecine et de pédiatrie connaissant de grandes difficultés et une mauvaise prise en charge des malades.

Guillaume Jouquet
01/03/2007

In recent years, MSF has recognized the need to improve its handover process and outcomes. It is no longer satisfactory for the organization to enter a country, put in place a program and leave without taking some accountability for what remains after MSF’s departure. It is in this spirit that I accepted to come to Lesotho to evaluate a handover tool that was implemented here during the initial phase of the handover.

Annie Désilets
30/04/2010

This report summarises the key lessons learned from MSF's cholera interventions in Zambia 2004, 2006, 2008, 2010 (OCBA), Guinea Bissau 2005-2008 (OCBA), Juba 2006 (OCBA), Haiti 2010-2011 (OCBA), Angola 2006 (OCB, OCA, OCBA), Zimbabwe 2009 (OCB, OCA, OCBA)

M Iscla
09/05/2012

Pages