Photos: 

Evaluation reports are either openly accessible via pdf download, or accessible via MSF's internal Sharepoint, which is mainly due to the sensitive nature of the operational contexts and resulting content. However, there are ongoing discussions about making all evaluation reports publicly searchable. If you are an MSF association member, reports are made available on various associate platforms such as www.insideOCB.com.

Country/Region

C

This survey investigates patients’ coping mechanisms and their dependence on medical institutions both from the patients’ standpoint and from that of MSF’s project teams.

Marc Le Pape and Suzanne Bradol
08/07/2015

Through an analysis of the events that have marked MSF’s history since 2003, this series of case studies and historical accounts describes the evolution of MSF's humanitarian ambitions, the resistance to these ambitions and the political arrangements that overcame this resistance (or that failed to do so).

edited by Claire Magone, Michaël Neuman, Fabrice Weissman
22/11/2011

The evaluation looks at the process for managing MSF-OCP's construction/rehabilitation projects since 2012. The main problems identified are not related to the process itself, but the way it is put into application. The main users pointed out the long delays (periods of indicision) as being the biggest difficulty, followed by budget/cost issues (cost/m² estimates) , and the quality of constructions (techniques, materials, etc). One of the root causes of delays relates to unclear/incomplete definition of roles and responsibilities = actions to take.

Nicolas Bérubé & Vincent Brown
16/07/2015

2005 was marked by two major natural calamities, the tsunami waves in South East Asia and the earthquake in Kashmir, Pakistan. Both of them were followed by a large intervention of MSF. After the initial assessment, MSF Belgium concentrated his efforts on the district of Bagh. The report will focus on the first 3 months of the intervention. As only a few documents are available, it was requested to reconstitute a chronology of intervention. Secondly, when there was time available, a short description and appreciation of the interventions of the other MSF sections was asked.

William Claus
01/04/2006

In the last few years, MSF OCG has developed an Operational Policy with the ambition to increase and improve the quantity and quality of secondary health care structures (or inpatient care). This recognition has prompted the organization to take a closer look at the challenges, lessons and accomplishments in terms of hospital management to develop strategies that will enable the organization to successfully set up, govern, implement and exit inpatient projects in all types of contexts.

This publication was produced at the request of MSF OCG, under the management of the Vienna Evaluation Unit. It was prepared independently by Annie Désilets and Ines Hake.
28/03/2017

Au cours des dernières années, MSF-OCG a élaboré une politique opérationnelle avec l'ambition d'augmenter et d'améliorer la quantité et la qualité des structures de soins secondaires (ou soins hospitaliers). Cette situation a incité MSF à examiner de plus près les défis, les enseignements et les réalisations en matière de gestion hospitalière afin d'élaborer des stratégies gagnantes pour le démarrage, l'opération et la fermeture de projets pour patients hospitalisés, dans tous les types de contextes.

This publication was produced at the request of MSF OCG, under the management of the Vienna Evaluation Unit. It was prepared independently by Annie Désilets and Ines Hake.
09/10/2017

This evaluation concerns the Natural Disaster Emergency Preparedness & Response Programme (NDPrep) executed by MSF-H in Bangladesh and the resulting interventions related to the floods in the period July - November 1998. A field visit to Bangladesh was made from 30 November - 10 December.

Contents

Van de Putte, B.
01/04/1999

RIDER, CRASH and Epicentre have finalized a critical review of the operations of MSF France in Borno, Nigeria, from 2015 to 2016.

***English and French version available***

This publication was produced by RIDER, CRASH and Epicentre.
01/03/2019

This review of operational choices and decisions in Pakistan was carried out in 2011 and has now been produced in a shorter summary version. The report provides a historical overview of OCB presence in the country and looks at the way that the operational strategy developed over time, both in response to the external factors but also as OCB used a number of strategies to create an operational space. Many of the findings remain valid today within Pakistan and also in similar missions. A full version of the report is available from Stockholm Evaluation Unit.

Boris Stringer
01/09/2011

Pages