Photos: 

Some evaluation reports are public and can be downloaded from this website, while others are restricted to MSF users and can only be accessed via Tukul. This limitation is mainly due to the sensitive nature of the operational contexts and the resulting content. However, there are internal discussions about making all evaluation reports publicly searchable. If you are an MSF association member, reports are made available on various associate platforms such as www.insideOCB.com.

Country/Region

This document describes the Lessons identified during the emergency phase of the MSF Sweden (MSFSE) response to the November 2013 Philippines Disaster. It summarises the successes and challenges encountered during the process, lists the important learning themes arising from these successes and challenges, and includes a set of lessons derived from an analysis of these learning themes.

Full Report

This Retrospect was facilitated by the Stockholm Evaluation Unit on behalf of the Project Team. The report has been prepared by Timothy McCann.
12/07/2019

The MSF Sweden Innovation Unit (SIU) aims to promote innovations that help save lives and alleviate suffering, and to develop a culture of innovation within MSF. Since its initial creation in 2012, the SIU has gone  through a rapid period of development. It has been transformed from a project into a separate unit with activities having become more structured and professional, and the number of innovation initiatives and projects increasing along with the unit size.

This publication was produced at the request of the Sweden Innovation Unit, MSF Sweden, under the management of the Vienna Evaluation Unit. It was prepared independently by Patrick Robitaille and Chris Houston.
09/05/2019

The objective of this lessons learnt exercise was to assess the advantages and disadvantages of the UNITAID grant governance and management model for project achievements in terms of medical (and related) outcomes, strategic decisions, the potential for collaboration between multiple MSF entities and to leverage the learnings for replication in future projects. The exercise showed that the project directly delivered a new, more effective, simpler and much cheaper treatment to patients across seven countries.

This publication was produced at the request of MSF OCG, under the management of the Vienna Evaluation Unit. It was prepared independently by Hugues Juillerat, Sharon McClenaghan and Glenn O’Neil of TRAASS International.
15/01/2019

In recent years, MSF has noted that ‘social violence’ is strongly linked to health exclusion and dysfunctional health systems. Therefore, the Operational Centre Geneva (OCG) initiated an intervention in Honduras in 2010 and a project in Nuevo Laredo, Mexico in January 2014. The current evaluation aims to determine the pertinence, appropriateness, effectiveness and impact of the OCG projects in Honduras and Mexico in responding to identified needs.

This publication was produced at the request of MSF OCG, under the management of the Vienna Evaluation Unit. It was prepared independently by Silvia Gurrola Bonilla, MSc. and Regina Escudero Durán, MD.
23/02/2016

In recent years, MSF has noted that ‘social violence’ is strongly linked to health exclusion and dysfunctional health systems. Therefore, the Operational Centre Geneva (OCG) initiated an intervention in Honduras in 2010 and a project in Nuevo Laredo, Mexico in January 2014. The current evaluation aims to determine the pertinence, appropriateness, effectiveness and impact of the OCG projects in Honduras and Mexico in responding to identified needs.

This publication was produced at the request of MSF OCG, under the management of the Vienna Evaluation Unit. It was prepared independently by Silvia Gurrola Bonilla, MSc. and Regina Escudero Durán, MD.
23/02/2016

This end of project evaluation of the Roma and Semongkong project “Reducing maternal and infant morbidity and mortality in a hyper-epidemic HIV/TB setting” in Lesotho was commissioned by the MSF Operational Centre Brussels (OCB) South Africa & Lesotho mission to evaluate the impact of the five years programme and identify lessons learned to support the design and planning of potential future projects in Lesotho.

This evaluation was conducted by Heidi Becher and Timothy McCann, on behalf of the Stockholm Evaluation Unit of MSF. This publication was produced at the request of MSF OCB, under the management of the Stockholm Evaluation Unit. It was prepared independently by heidi Becher and Timothy McCann.
30/12/2015

This evaluation aimed at gaining perspective on and learning from current partnership practices, informing the debate on MSF’s policy on partnerships and providing guidance for future engagement. Four separate field evaluations in DRC, Kenya, Niger and North Korea as well as a desk review of seven additional partnerships have been conducted. The report provides good practice examples and practical recommendations.

Karima Hammadi and Annie Désilets
01/02/2012

Through an analysis of the events that have marked MSF’s history since 2003, this series of case studies and historical accounts describes the evolution of MSF's humanitarian ambitions, the resistance to these ambitions and the political arrangements that overcame this resistance (or that failed to do so).

edited by Claire Magone, Michaël Neuman, Fabrice Weissman
22/11/2011

Zahedan Project for Afghan refugees in Iran : 1st a necessary historical review; and an analysis of the political and technical relevance of the project (10 years). MSF could have proposed earlier health activities directly oriented for local Iraniens. The adequacy of means related to project objectives is considered satisfactory.

Tommaso Fabbri & Vincent Brown
01/04/2011

Towards the end of 2006/ early 2007, MSF-OCB opened a primary health care project in Chhattisgarh, India, part of the Red Corridor within which a low-intensity conflict is taking place between Maoists and Government. The situation remains volatile with potential for the project to remain operational for some years. Within this context, and given no history of previous evaluations, a decision was taken to assess the relevance and impact of the project, as well as the appropriateness of operational strategies in relation to these, including the potential for phase out.

Iesha Singh, Anneli Eriksson and Alexandra Papis
25/01/2011

Pages