Photos: 

Some evaluation reports are public and can be downloaded from this website, while others are restricted to MSF users and can only be accessed via Tukul. This limitation is mainly due to the sensitive nature of the operational contexts and the resulting content. However, there are internal discussions about making all evaluation reports publicly searchable. If you are an MSF association member, reports are made available on various associate platforms such as www.insideOCB.com.

This document describes the Lessons identified during the emergency phase of the MSF Sweden (MSFSE) response to the November 2013 Philippines Disaster. It summarises the successes and challenges encountered during the process, lists the important learning themes arising from these successes and challenges, and includes a set of lessons derived from an analysis of these learning themes.

Full Report

This Retrospect was facilitated by the Stockholm Evaluation Unit on behalf of the Project Team. The report has been prepared by Timothy McCann.
12/07/2019

RIDER, CRASH and Epicentre have finalized a critical review of the operations of MSF France in Borno, Nigeria, from 2015 to 2016.

***English and French version available***

This publication was produced by RIDER, CRASH and Epicentre.
01/03/2019

After seven years of existence and shortly before its closure, Cell 2 and the Direction of Operations launched a lessons-learned exercise of the Cardiovascular Emergency Project set at Hospital No. 9 in Grozny, Chechnya. The objective of this review was to relate the main steps and lessons of this so-called "atypical" medical project, at least in the light of MSF's experience, mobilizing a high-tech clinical expertise such as thrombolysis and angiography.

***English and French version available***

This publication was produced by MSF OCP, Cell2, in cooperation with RIDER.