Photos: 

Some evaluation reports are public and can be downloaded from this website, while others are restricted to MSF users and can only be accessed via Tukul. This limitation is mainly due to the sensitive nature of the operational contexts and the resulting content. However, there are internal discussions about making all evaluation reports publicly searchable. If you are an MSF association member, reports are made available on various associate platforms such as www.insideOCB.com.

The evaluation of National Emergency Pools MSF-OCP in Nigeria, DRC, and Chad, show variable investments and interest by missions. In certain cases there is a true added value that is recognised by teams prepared and backed up by MSF Coordinations and Paris HQs (with or without the E-desk intervention). After several years of functionning, a clearer frame has to be defined: follow up of carrier path, ad-hoc trainings, technical back up notably for emergency interventions. Periods away from emegencies should allow to improve the emergency response set ups with NEPs.

VBROWN
06/12/2012

L'évaluation des Pool d'Urgence Nationaux MSF-OCP au Nigeria, en RDC, et au Tchad montre des investissements et des intérêts variables selon les missions. Dans certains cas il existe une véritable valeur ajoutée qui est reconnue avec des équipes préparées et épaulées par les Coordinations et le Siège de Paris (ceci avec ou sans intervention du Desk d'Urgence). Après plusieurs années de fonctionnement, un cadre mieux défini reste à établir : suivi de parcours, formations ad-hoc, appui technique en particulier lors d'interventions sur les urgences.

VBROWN
25/10/2012

This document describes the Lessons identified during the emergency phase of the OCA Rakhine intervention. It summarises the successes and challenges encountered during the project, lists the important learning themes arising from these successes and challenges, and includes a set of lessons derived from an analysis of these learning points.

Stockholm Evaluation Unit
11/10/2012

Les équipes MSF ont vacciné 1.5 M d'enfants pendant une période de 10 mois, and ont traité 51 000 cas (80% du total) dans la Province du Katanga (RDC). MSF souhaitait revisiter et capitaliser sur cette intervention sans précédents où les questions majeures concernent la magnitide de l'intervention, le processus décisionnel (basé sur les besoins, l'extension de l'épidémie/épidémio, les groupes d'âge, la géographie, TA%, Fatalité%, etc).

Vincent Brown
18/06/2012

Ce rapport d'évaluation fait partie du rapport "Enriched or Confined? MSF-Engagement in Local Partnerships".

Karima Hammadi
03/06/2012

This report summarises the key lessons learned from MSF's cholera interventions in Zambia 2004, 2006, 2008, 2010 (OCBA), Guinea Bissau 2005-2008 (OCBA), Juba 2006 (OCBA), Haiti 2010-2011 (OCBA), Angola 2006 (OCB, OCA, OCBA), Zimbabwe 2009 (OCB, OCA, OCBA)

M Iscla
09/05/2012

This evaluation report is part of the overall report "Enriched or Confined? MSF-Engagement in Local Partnerships".

Karima Hammadi
05/03/2012

After the 12 January 2010 earthquake in Port-au-Prince, 4 MSF sections (OCG, OCA, OCP and OCB) decided to build container hospitals to respond to the health care needs (including Léogâne). All of these prefabricated structures, though varying in quality, were unique in that they were partially or completely built from modular containers (with different architectural designs). Construction was done by subcontractors, MSF teams trained in construction, or a combination of the two.

Monique Lathelize, Marie-Laure Le Coconnier, Julien Bégou
02/02/2012

- L’évaluation technique demandée par les ROL (Resp Opés Log) de 5 OCs MSF a permis de capitaliser sur une liste de produits pertinents/construction de la conception à la réalisation. Les projets MSF ont tous abouti (ça marche !), mais un Comité de Projet permanent doit garantir le suivi de projets aussi ambitieux. - La réalisation en urgence pour certains (6 à 8 mois) doit être modulée en fonction des exigences de qualité, projet à moyen terme (3 à 5 ans). - L’utilisation de conteneurs est pertinente en post-séisme, mais la durabilité des matériaux reste un facteur à prendre en compte.

FPENFEUNTEUN
02/02/2012

Pages