Photos: 

Some evaluation reports are public and can be downloaded from this website, while others are restricted to MSF users and can only be accessed via Tukul. This limitation is mainly due to the sensitive nature of the operational contexts and the resulting content. However, there are internal discussions about making all evaluation reports publicly searchable. If you are an MSF association member, reports are made available on various associate platforms such as www.insideOCB.com.

Integration of HIV/TB services is one of the priorities for the MSF movement since 2010 and in particular for OCBA that started hand over of the so-called vertical programs in the same year. This process has finished for the total of 16 vertical HIV programs of MSF-OCBA started since 2005. Integration aims to provide access to HIV/TB care to all populations in need in locations where MSF has implemented regular projects, regardless of the HIV prevalence in places such as CAR (started in 2008), South Sudan (2011) and Niger (2014).

This publication was produced at the request of MSF OCBA, under the management of the Athens Evaluation Unit. It was prepared independently by Geraldine Brun and Heinz Henghuber (TL) and managed by the Athens Evaluation Referent Dimitra Kageropoulos.
10/11/2016

This end of project evaluation of the Roma and Semongkong project “Reducing maternal and infant morbidity and mortality in a hyper-epidemic HIV/TB setting” in Lesotho was commissioned by the MSF Operational Centre Brussels (OCB) South Africa & Lesotho mission to evaluate the impact of the five years programme and identify lessons learned to support the design and planning of potential future projects in Lesotho.

This evaluation was conducted by Heidi Becher and Timothy McCann, on behalf of the Stockholm Evaluation Unit of MSF. This publication was produced at the request of MSF OCB, under the management of the Stockholm Evaluation Unit. It was prepared independently by heidi Becher and Timothy McCann.
30/12/2015

In recent years, MSF has recognized the need to improve its handover process and outcomes. It is no longer satisfactory for the organization to enter a country, put in place a program and leave without taking some accountability for what remains after MSF’s departure. It is in this spirit that I accepted to come to Lesotho to evaluate a handover tool that was implemented here during the initial phase of the handover.

Annie Désilets
30/04/2010

MSF has been present in the Nchelenge region since 1998, when a program was started to provide health care to Angolan and Congolese refugees who had arrived in the region. The MSF project in Nchelenge District was started in April 2001 because of lack of access to HIV/AIDS care in an area with an HIV prevalence estimated at 16.5%. The objective was to achieve a high coverage of treatment and care, and at the same time provide a model for decentralised programs to bring HIV/AIDS treatment and care to all people in Zambia and for MSF Holland/OCA more widely.

Kamalini Lokuge, Robert Musopole and Mupundu Banda
01/02/2010

Médecins Sans Frontières has been running HIV/AIDS treatment programmes since 2001. As national systems scaled up capacity, MSF began to hand over HIV projects in 2005. Variable experience with handover and internal debates about MSF responsibility to patients led OCG to propose an evaluation of the handover process, to learn from experience and inform policy and practice. A qualitative review was carried out through interviews, case studies in Cameroon and Laos, and review of other vertical and integrated HIV projects.

Dr. Rosamund Lewis and Dr. PehrOlov Pehrson
01/01/2009

MSF-CH did rehabilitate the Mundari hospital in Kajo Keji County (KKC) and did support the existing OPD from September 1997 onward. Environmental- and political factors and an estimated high HIV prevalence did lead to the decision to implement the first time an integrated HIV/AIDS component (2005). Towards the end of the project it was decided that the handover process, as well as the HIV integrated approach and the capacity build during the last 9 years of presence in KKC should be evaluated.

SCAVACO
01/12/2006