Photos: 

Some evaluation reports are public and can be downloaded from this website, while others are restricted to MSF users and can only be accessed via Tukul. This limitation is mainly due to the sensitive nature of the operational contexts and the resulting content. However, there are internal discussions about making all evaluation reports publicly searchable. If you are an MSF association member, reports are made available on various associate platforms such as www.insideOCB.com.

In early 2010 MSF/OCB responded to an increase of malaria in northern parts of Burundi The objectives of the intervention were: To reduce morbidity and mortality related to malaria in the area of intervention (general) and to ensure that the population in the area of intervention had access to preventive and curative measures against malaria.

Carina Johansson
01/11/2010

The Gondama Referral Centre (GRC) project is a reference hospital set up by Médecins Sans Frontières – Operational Centre Brussels (MSF-OCB) to provide secondary level healthcare to children under 15 and pregnant and lactating women in Gondama, Bo district in Sierra Leone. The Ministry of Health (MoH) having recently launched a free healthcare policy for the same target group1 provides a window of opportunity for MSF to gradually hand over its activities.

Guillaume Jouquet and Alexis Eggermont
01/07/2010

In recent years, MSF has recognized the need to improve its handover process and outcomes. It is no longer satisfactory for the organization to enter a country, put in place a program and leave without taking some accountability for what remains after MSF’s departure. It is in this spirit that I accepted to come to Lesotho to evaluate a handover tool that was implemented here during the initial phase of the handover.

Annie Désilets
30/04/2010

The hand over of MSF-F Phnom Penh HIV project is a complex process. This HIV cohort is the biggest of MSF OCP to be handed over so far and the hand over is almost directly done to the national health authorities, NGO partners having been identified only for minor parts of the project. In the first part of the report, a narrative description and an evaluation of the main technical aspects of the handover process are presented.

Cristina Orlandini
01/04/2010