Photos: 

Some evaluation reports are public and can be downloaded from this website, while others are restricted to MSF users and can only be accessed via Tukul. This limitation is mainly due to the sensitive nature of the operational contexts and the resulting content. However, there are internal discussions about making all evaluation reports publicly searchable. If you are an MSF association member, reports are made available on various associate platforms such as www.insideOCB.com.

Country/Region

This document describes the project Lessons identified at the end of the market entry planning phase for MSF in Finland. It summarises the successes and challenges encountered during the project, lists the learning themes arising from these successes and challenges, and includes a set of lessons derived from an analysis of these learning points. The Annex contains a proposed (brief) framework with criteria and pre-requisites for a successful Market Entry Plan in MSF based on this experience. NOTE: This is not an evaluation and therefore there is no ambition for independent judgement.

This Retrospect was facilitated by the Stockholm Evaluation Unit on behalf of the Project Team. The report has been prepared by Timothy McCann.
30/10/2017

Since civil unrest and violence erupted in countries across Northern Africa and the Middle East (referred as NAME in the document) teams from the five MSF OCs (Operational Centres) have been assisting the populations. OCB has mainly been active in Egypt, Bahrain, Libya and Italy (Lampedusa with the influx of migrants from the Northern African regions). Activities and challenges have varied from one context to another. The overall aim of the mapping/compilation is to describe all of OCB’s activities from January to August 2011, in relation to the unrests.

David Crémoux
01/09/2011

In January 2006 the MSF-CH Meditrina was launched in Zürich with the objective to provide first-line medical assistance to people excluded from the Swiss health care system, primarily on the grounds of their illegal presence on Swiss territory. A team of the two evaluators reviewed documents, interviewed Meditrina team, beneficiaries, stakeholders and authorities, visited project sites.

admin
19/02/2008

The Meditrina project was initiated in January 2006 as a gate-keeping system based on the model of Frisanté in Fribourg. Meditrina had a low frequentation after one year. A pro-active strategy was then started. Ten months later, this mid-term evaluation is done in order to show the impact of the new strategy and to propose future orientation.

Sophie Odermatt and Anne-Claire Galli
15/12/2007

The Bosnia programme was one of the largest programmes MSF has implemented so far, and it was the first major operation MSF executed in an European environment. There was a widely shared view that the programme had gone “out of control”. As a result, many within MSF considered drug distribution in general as being beyond the scope of MSF. The dominance of drug distribution in the programme was perceived to be in contradiction with the medical identity of MSF.

Van de Putte, B. and Maslesa, L.
01/04/1998