Some evaluation reports are public and can be downloaded from this website, while others are restricted to MSF users and can only be accessed via Tukul. This limitation is mainly due to the sensitive nature of the operational contexts and the resulting content. However, there are internal discussions about making all evaluation reports publicly searchable. If you are an MSF association member, reports are made available on various associate platforms such as www.insideOCB.com.

Country/Region

This document describes the project Lessons identified at the end of the market entry planning phase for MSF in Finland. It summarises the successes and challenges encountered during the project, lists the learning themes arising from these successes and challenges, and includes a set of lessons derived from an analysis of these learning points. The Annex contains a proposed (brief) framework with criteria and pre-requisites for a successful Market Entry Plan in MSF based on this experience. NOTE: This is not an evaluation and therefore there is no ambition for independent judgement.

This Retrospect was facilitated by the Stockholm Evaluation Unit on behalf of the Project Team. The report has been prepared by Timothy McCann.
30/10/2017

A series of failures was the starting point for this analysis. Several outbreaks of hepatitis E, transmitted via the water supply, occurred in refugee and IDP sites in the Sahel (Sudan in 2004, and Chad in 2007) and in central Africa (Central African Republic in 2002, and Uganda in 2007). MSF was responsible for all or part of the water supply, as well as medical care. These outbreaks are a reminder that significant infectious risks persists even after we implement our usual procedures.

Jean-Hervé Bradol, Francisco Diaz, Jérôme Léglise, Marc Le Pape
08/07/2015

MSF OCP Field Coordinators requested this review in order to clarify the future perspectives related to this long term mission with stakeholders and field visits in West Bank; it allowed to confirm the relevance of working in Palestinian Occupied territories (PoT), but future operational objectives need to be reconsidered and adapted to the on-going context in West bank, such as areas of intervention or target populations (analyses were based on main historical events over time and operational response, MSF and Partners - EU/Echo invited - NGOs met on the spot).

Claire Beuzelin, Vincent Brown
06/06/2014

Zahedan Project for Afghan refugees in Iran : 1st a necessary historical review; and an analysis of the political and technical relevance of the project (10 years). MSF could have proposed earlier health activities directly oriented for local Iraniens. The adequacy of means related to project objectives is considered satisfactory.

Tommaso Fabbri & Vincent Brown
01/04/2011

Internal report An Ebola outbreak was declared in Uganda on 29th of November 2007. An MSF Intervention took place between 1st of December 2007 and 18th January 2008. This report summarises, after general issues, the main points on intersection coordination, coordination with other/external actors, human resources management, expat health and project set up.

admin
09/06/2008

 

French report. MSF restarted the activities of the General Reference Hospital in Man in 2003 in order to deliver primary and secondary health care. As well as providing medcidines and medical/surgical material, MSF also provided medical, para-medical, and HR staff to support the hospital. A therapeutic nutrition centre was also opened. MSF also managed 2 other regional hospitals. This evaluation examined the effectiveness and appropriateness of the services provided by MSF.

Marie-Eve Burny
08/03/2006

MSF-CH has been working in Gulu since 2003, supporting different health structures and running a shelter for “night commuters”. This evaluation was initiated by the desk, mainly because the progress of this project was slow and there were doubts whether it addresses real needs. Hence the general objective of the evaluation was to review the intervention in Gulu and determine its Relevance, Effectiveness and Efficiency. In addition Perception, Co-ordination and Exit strategies were looked at. The evaluation was carried out between September and October 2005.

admin
01/10/2005