Some evaluation reports are public and can be downloaded from this website, while others are restricted to MSF users and can only be accessed via Tukul. This limitation is mainly due to the sensitive nature of the operational contexts and the resulting content. However, there are internal discussions about making all evaluation reports publicly searchable. If you are an MSF association member, reports are made available on various associate platforms such as www.insideOCB.com.

Country/Region

This document describes the Lessons identified during the emergency phase of the MSF Sweden (MSFSE) response to the November 2013 Philippines Disaster. It summarises the successes and challenges encountered during the process, lists the important learning themes arising from these successes and challenges, and includes a set of lessons derived from an analysis of these learning themes.

Full Report

This Retrospect was facilitated by the Stockholm Evaluation Unit on behalf of the Project Team. The report has been prepared by Timothy McCann.
12/07/2019

The MSF Sweden Innovation Unit (SIU) aims to promote innovations that help save lives and alleviate suffering, and to develop a culture of innovation within MSF. Since its initial creation in 2012, the SIU has gone  through a rapid period of development. It has been transformed from a project into a separate unit with activities having become more structured and professional, and the number of innovation initiatives and projects increasing along with the unit size.

This publication was produced at the request of the Sweden Innovation Unit, MSF Sweden, under the management of the Vienna Evaluation Unit. It was prepared independently by Patrick Robitaille and Chris Houston.
09/05/2019

This document describes the project Lessons identified at the end of the market entry planning phase for MSF in Finland. It summarises the successes and challenges encountered during the project, lists the learning themes arising from these successes and challenges, and includes a set of lessons derived from an analysis of these learning points. The Annex contains a proposed (brief) framework with criteria and pre-requisites for a successful Market Entry Plan in MSF based on this experience. NOTE: This is not an evaluation and therefore there is no ambition for independent judgement.

This Retrospect was facilitated by the Stockholm Evaluation Unit on behalf of the Project Team. The report has been prepared by Timothy McCann.
30/10/2017

Integration of HIV/TB services is one of the priorities for the MSF movement since 2010 and in particular for OCBA that started hand over of the so-called vertical programs in the same year. This process has finished for the total of 16 vertical HIV programs of MSF-OCBA started since 2005. Integration aims to provide access to HIV/TB care to all populations in need in locations where MSF has implemented regular projects, regardless of the HIV prevalence in places such as CAR (started in 2008), South Sudan (2011) and Niger (2014).

This publication was produced at the request of MSF OCBA, under the management of the Athens Evaluation Unit. It was prepared independently by Geraldine Brun and Heinz Henghuber (TL) and managed by the Athens Evaluation Referent Dimitra Kageropoulos.
10/11/2016

The review aimed to capture learnings from this difficult exit process in South Sudan and provides an overview of the root causes identified. Some external factors are linked to the context and the position of the authorities and they must be considered as hard to influence. The internal lessons identified can be addressed by OCB. The two key areas are the communication and working relation with South Sudanese staff and use of the (existing) know-how in OCB in regards to exiting a project.

This publication was produced at the request of MSF OCB's Operational Director, under the management of the Stockholm Evaluation Unit. It was prepared independently by Sabine Kampmueller of the Stockholm Evaluation Unit.
28/06/2016

In recent years, MSF has noted that ‘social violence’ is strongly linked to health exclusion and dysfunctional health systems. Therefore, the Operational Centre Geneva (OCG) initiated an intervention in Honduras in 2010 and a project in Nuevo Laredo, Mexico in January 2014. The current evaluation aims to determine the pertinence, appropriateness, effectiveness and impact of the OCG projects in Honduras and Mexico in responding to identified needs.

This publication was produced at the request of MSF OCG, under the management of the Vienna Evaluation Unit. It was prepared independently by Silvia Gurrola Bonilla, MSc. and Regina Escudero Durán, MD.
23/02/2016

In recent years, MSF has noted that ‘social violence’ is strongly linked to health exclusion and dysfunctional health systems. Therefore, the Operational Centre Geneva (OCG) initiated an intervention in Honduras in 2010 and a project in Nuevo Laredo, Mexico in January 2014. The current evaluation aims to determine the pertinence, appropriateness, effectiveness and impact of the OCG projects in Honduras and Mexico in responding to identified needs.

This publication was produced at the request of MSF OCG, under the management of the Vienna Evaluation Unit. It was prepared independently by Silvia Gurrola Bonilla, MSc. and Regina Escudero Durán, MD.
23/02/2016

In October 2013 MSF developed a proposal for a new WHS strategy for meeting the medical humanitarian needs in large scale emergencies. In May 2015, the MSF Stockholm Evaluation Unit commissioned an evaluation of the 2013 MSF Operational Centre Amsterdam (OCA) strategy for a more offensive WHS approach. The evaluation focused on OCA interventions in South Sudan in Jaman, 2012, Bentui in 2014, CAR/Bossangoa and Bangui in 2014 and Ethiopia/Gambella in 2014. The period of evaluation was the first 3 months of the interventions.

26/11/2015

The evaluation looks at the process for managing MSF-OCP's construction/rehabilitation projects since 2012. The main problems identified are not related to the process itself, but the way it is put into application. The main users pointed out the long delays (periods of indicision) as being the biggest difficulty, followed by budget/cost issues (cost/m² estimates) , and the quality of constructions (techniques, materials, etc). One of the root causes of delays relates to unclear/incomplete definition of roles and responsibilities = actions to take.

Nicolas Bérubé & Vincent Brown
16/07/2015

This evaluation looks at the OCBA response in the Upper Nile crisis in 2014. OCBA, with emergency response as its core action, attempts to examine the response in real time. It’s the first time OCBA uses the real time evaluation as a tool for improving their emergency programs. The report describes the way OCBA responded to the needs of the displaced in a volatile context. The analysis focuses on the relevance, appropriateness and effectiveness of the program and coordination between the regular and emergency missions, other MSF sections and various external actors.

DKALOGEROPOULOU
08/01/2015