Photos: 

Some evaluation reports are public and can be downloaded from this website, while others are restricted to MSF users and can only be accessed via Tukul. This limitation is mainly due to the sensitive nature of the operational contexts and the resulting content. However, there are internal discussions about making all evaluation reports publicly searchable. If you are an MSF association member, reports are made available on various associate platforms such as www.insideOCB.com.

Country/Region

After seven years of existence and shortly before its closure, Cell 2 and the Direction of Operations launched a lessons-learned exercise of the Cardiovascular Emergency Project set at Hospital No. 9 in Grozny, Chechnya. The objective of this review was to relate the main steps and lessons of this so-called "atypical" medical project, at least in the light of MSF's experience, mobilizing a high-tech clinical expertise such as thrombolysis and angiography.

***English and French version available***

This publication was produced by MSF OCP, Cell2, in cooperation with RIDER.
01/03/2019

This document describes the project Lessons identified at the end of the market entry planning phase for MSF in Finland. It summarises the successes and challenges encountered during the project, lists the learning themes arising from these successes and challenges, and includes a set of lessons derived from an analysis of these learning points. The Annex contains a proposed (brief) framework with criteria and pre-requisites for a successful Market Entry Plan in MSF based on this experience. NOTE: This is not an evaluation and therefore there is no ambition for independent judgement.

This Retrospect was facilitated by the Stockholm Evaluation Unit on behalf of the Project Team. The report has been prepared by Timothy McCann.
30/10/2017

MSF has received UNITAID grants since 2013. For several financial, operational and opportunistic reasons, the opportunity and adequacy of receiving funds from UNITAID was questioned by the MSF medical and operational directors. In October 2014 the MedOp platform took a decision not to seek any further UNITAID funding for a one-year period-ending in October 2015.

This evaluation was conducted by Nicole Henze on behalf of the Stockholm Evaluation Unit of MSF. Finalised in November 2015. This publication was produced at the request of MSF MedOp, under the management of the Stockholm Evaluation Unit. It was prepared independently by Nicole Henze.
30/12/2015

The example of Shishelweni demonstrates that in the context of high prevalence of HIV/TB infections and limited resources available decentralisation of HIV and TB care from regional and district hospitals to primary health care clinics and community level is the way to improve access, coverage, effectiveness and efficiency of service delivery. It also improves satisfaction and acceptance of health service providers, direct beneficiaries and the wider community.

Mzia Turashvili
01/12/2013

In the last decade, while facing increasingly complex “projects”, MSF-OCP has chosen to add means to improve its interventions. This results in the actual growth syndrome of MSF-OCP HQ departments, which is also significantly impacting country coordination (CC) set-ups and means. New scenarios should be tested, notably for mono-projects (to revise), the idea being to reduce CC set-ups whenever possible. Resources' analyses highlight the importance of competent persons to follow (coordinators & key positions), including PCs, with a clearer career path.

Marie‐Laure Le Coconnier
01/08/2013

Through an analysis of the events that have marked MSF’s history since 2003, this series of case studies and historical accounts describes the evolution of MSF's humanitarian ambitions, the resistance to these ambitions and the political arrangements that overcame this resistance (or that failed to do so).

edited by Claire Magone, Michaël Neuman, Fabrice Weissman
22/11/2011

Since early 2004 OCA has been implementing in Chechnya a DOTS Tuberculosis program through “remote control” using TB facilities and staff of the Republican Ministry of Health TB Program. This DOTS TB program has been successful in its implementation, its phased expansion and its treatment outcome (persistent high success rates with low death, defaulter and failure rates).

Dr. Andrei Slavuckij and Dr. Roger Teck
26/01/2011

The overall objective of the evaluation is to identify and describe factors and issues to consider when planning implementation or continuation of Remote Control Programmes (RCPs) as an alternative to cancelling Médecins Sans Frontières (MSF) programme implementation in a particular region/ country.

Martin Braaksma and Mzia Turashvili
01/06/2009

 

French report. MSF launched a project in Mali in September 2007 to treat Vesicovaginal fistula (VVF) which continued until January 2008. This cost analysis study was conducted in response to concerns about the high costs of the surgical procedure.

Please note: this report is not available online. Please email Evaluations.Sweden@lakareutangranser.se to request access.
 

Guillaume Jouquet
02/04/2009

This evaluation was requested by MSF CH Geneva and focuses on the pertinence, efficacy and impact of the sexual violence project in Guatemala. The motivation to evaluate this program stemmed from difficulties at the initial stages of the project in realizing the goals through the original strategies chosen. The results answer key questions about the added value of the intervention regarding the problem of the sexual violence (SV).

María Luisa Cabrera Pérez-Armiñan and Marilyn McHarg
10/03/2009

Pages