Photos: 

Some evaluation reports are public and can be downloaded from this website, while others are restricted to MSF users and can only be accessed via Tukul. This limitation is mainly due to the sensitive nature of the operational contexts and the resulting content. However, there are internal discussions about making all evaluation reports publicly searchable. If you are an MSF association member, reports are made available on various associate platforms such as www.insideOCB.com.

Country/Region

Through an analysis of the events that have marked MSF’s history since 2003, this series of case studies and historical accounts describes the evolution of MSF's humanitarian ambitions, the resistance to these ambitions and the political arrangements that overcame this resistance (or that failed to do so).

edited by Claire Magone, Michaël Neuman, Fabrice Weissman
22/11/2011

In February 2011, four MSF staff members acquired Lassa Fever in the MSF-run hospital, GRC (2 of whom died). This led OCB to propose an evaluation of the related events occurring in January-March, in order to learn lessons and possibly adjust internal procedures or processes. A qualitative evaluation was carried out through interviews and document-review.

Mzia Turashvil
09/08/2011

Zahedan Project for Afghan refugees in Iran : 1st a necessary historical review; and an analysis of the political and technical relevance of the project (10 years). MSF could have proposed earlier health activities directly oriented for local Iraniens. The adequacy of means related to project objectives is considered satisfactory.

Tommaso Fabbri & Vincent Brown
01/04/2011

Towards the end of 2006/ early 2007, MSF-OCB opened a primary health care project in Chhattisgarh, India, part of the Red Corridor within which a low-intensity conflict is taking place between Maoists and Government. The situation remains volatile with potential for the project to remain operational for some years. Within this context, and given no history of previous evaluations, a decision was taken to assess the relevance and impact of the project, as well as the appropriateness of operational strategies in relation to these, including the potential for phase out.

Iesha Singh, Anneli Eriksson and Alexandra Papis
25/01/2011

The Gondama Referral Centre (GRC) project is a reference hospital set up by Médecins Sans Frontières – Operational Centre Brussels (MSF-OCB) to provide secondary level healthcare to children under 15 and pregnant and lactating women in Gondama, Bo district in Sierra Leone. The Ministry of Health (MoH) having recently launched a free healthcare policy for the same target group1 provides a window of opportunity for MSF to gradually hand over its activities.

Guillaume Jouquet and Alexis Eggermont
01/07/2010

Médecins Sans Frontières has been running HIV/AIDS treatment programmes since 2001. As national systems scaled up capacity, MSF began to hand over HIV projects in 2005. Variable experience with handover and internal debates about MSF responsibility to patients led OCG to propose an evaluation of the handover process, to learn from experience and inform policy and practice. A qualitative review was carried out through interviews, case studies in Cameroon and Laos, and review of other vertical and integrated HIV projects.

Dr. Rosamund Lewis and Dr. PehrOlov Pehrson
01/01/2009

MSF-CH’s project for street children in Tegucigalpa started in 2005 and has been gradually adapted and revised to focus on the actual target population: children and youth sleeping permanently or temporarily in the streets who are more at risk to suffer from violence. Between the end of September and mid-October a visit was done to evaluate the programme of MSF-Switzerland for street children in Tegucigalpa, Honduras. The main objectives of the visit were: 1.

Carmen Rodríguez and Theo Kreuzen
01/11/2007

MSF had been working in Honduras and Guatemala in HIV prevention and care of people living with HIV and AIDS for several years before ART projects were started in 2001. In 2005 the projects were handed over to the National AIDS Programme, though MSF-CH kept some staff in both countries to monitor progress. This evaluation was planned a year and a half after handing over the project, to document the perception of people regarding lessons learnt; whether the project was handed over properly; and the quality of care for people living HIV.

SCAVACO
01/02/2007

This evaluation is an end of project cycle evaluation. The main purposes, as with all evaluations in MSF-H, are learning and accountability. While the project was initiated with a three year time line, certain activities may continue for the coming two years. The conclusions and results of this evaluation will be used as a guide for future medical programming.

Cunningham, D.
01/04/2000

Pages