Photos: 

Some evaluation reports are public and can be downloaded from this website, while others are restricted to MSF users and can only be accessed via Tukul. This limitation is mainly due to the sensitive nature of the operational contexts and the resulting content. However, there are internal discussions about making all evaluation reports publicly searchable. If you are an MSF association member, reports are made available on various associate platforms such as www.insideOCB.com.

Country/Region

Following the earthquake in 2010 and the emergency response that ensued, MSF-OCG took the decision to invest in a hospital in the Leogane area that was for several years the biggest hospital managed by MSF-OCG. Given that for the last three years this was the only MSF-OCG project in the country, that the capital is located only two hours from the hospital and that there is a strategic ambition within MSF-OCG to review mission set-ups, OCG and the field teams determined that 2013 was an opportune time to review the Haiti mission.

Annie Desilets
01/11/2014

Following the earthquake in 2010 and the emergency response that ensued, MSF-OCG took the decision to invest in a hospital in the Leogane area that was for several years the biggest hospital managed by MSF-OCG. Given that for the last three years this was the only MSF-OCG project in the country, that the capital is located only two hours from the hospital and that there is a strategic ambition within MSF-OCG to review mission set-ups, OCG and the field teams determined that 2013 was an opportune time to review the Haiti mission.

Annie Desilets
01/11/2014

MSF OCBA , Review of Partnership 2011-2013 Helsinki Citizen Assembly - MSF OCBA Istanbul - Kilis Migrants Syria Refugees Gaias Consulting C. Boulanger Soma

FDESTENABES
28/08/2014

This evaluation contributes to the debate around the OCB Martissant intervention following the proposed closure and resulting decision to scale down in 2013. The report concludes that the context remains similar to that of the beginning therefore the intervention is still as relevant as it was in 2006 however the evaluation questions the suitability of OCB's country wide strategy in Haiti, urging a focus towards the most vulnerable and marginalised urban populations, rather than towards the general needs of the population.

Stockholm Evaluation Unit
01/10/2013

This evaluation contributes to the debate around the OCB Martissant intervention following the proposed closure and resulting decision to scale down in 2013. The report concludes that the context remains similar to that of the beginning therefore the intervention is still as relevant as it was in 2006 however the evaluation questions the suitability of OCB's country wide strategy in Haiti, urging a focus towards the most vulnerable and marginalised urban populations, rather than towards the general needs of the population.

Stockholm Evaluation Unit
23/09/2013

This report summarises the key lessons learned from MSF's cholera interventions in Zambia 2004, 2006, 2008, 2010 (OCBA), Guinea Bissau 2005-2008 (OCBA), Juba 2006 (OCBA), Haiti 2010-2011 (OCBA), Angola 2006 (OCB, OCA, OCBA), Zimbabwe 2009 (OCB, OCA, OCBA)

M Iscla
09/05/2012

After the 12 January 2010 earthquake in Port-au-Prince, 4 MSF sections (OCG, OCA, OCP and OCB) decided to build container hospitals to respond to the health care needs (including Léogâne). All of these prefabricated structures, though varying in quality, were unique in that they were partially or completely built from modular containers (with different architectural designs). Construction was done by subcontractors, MSF teams trained in construction, or a combination of the two.

Monique Lathelize, Marie-Laure Le Coconnier, Julien Bégou
02/02/2012

- L’évaluation technique demandée par les ROL (Resp Opés Log) de 5 OCs MSF a permis de capitaliser sur une liste de produits pertinents/construction de la conception à la réalisation. Les projets MSF ont tous abouti (ça marche !), mais un Comité de Projet permanent doit garantir le suivi de projets aussi ambitieux. - La réalisation en urgence pour certains (6 à 8 mois) doit être modulée en fonction des exigences de qualité, projet à moyen terme (3 à 5 ans). - L’utilisation de conteneurs est pertinente en post-séisme, mais la durabilité des matériaux reste un facteur à prendre en compte.

FPENFEUNTEUN
02/02/2012

Pages