Photos: 

Some evaluation reports are public and can be downloaded from this website, while others are restricted to MSF users and can only be accessed via Tukul. This limitation is mainly due to the sensitive nature of the operational contexts and the resulting content. However, there are internal discussions about making all evaluation reports publicly searchable. If you are an MSF association member, reports are made available on various associate platforms such as www.insideOCB.com.

Country/Region

The evaluation of National Emergency Pools MSF-OCP in Nigeria, DRC, and Chad, show variable investments and interest by missions. In certain cases there is a true added value that is recognised by teams prepared and backed up by MSF Coordinations and Paris HQs (with or without the E-desk intervention). After several years of functionning, a clearer frame has to be defined: follow up of carrier path, ad-hoc trainings, technical back up notably for emergency interventions. Periods away from emegencies should allow to improve the emergency response set ups with NEPs.

VBROWN
06/12/2012

L'évaluation des Pool d'Urgence Nationaux MSF-OCP au Nigeria, en RDC, et au Tchad montre des investissements et des intérêts variables selon les missions. Dans certains cas il existe une véritable valeur ajoutée qui est reconnue avec des équipes préparées et épaulées par les Coordinations et le Siège de Paris (ceci avec ou sans intervention du Desk d'Urgence). Après plusieurs années de fonctionnement, un cadre mieux défini reste à établir : suivi de parcours, formations ad-hoc, appui technique en particulier lors d'interventions sur les urgences.

VBROWN
25/10/2012

L’évaluation des vulnérabilités urbaines dans la ville de Conakry a été commissionnée par MSF-CH pour identifier les populations les plus vulnérables et mieux comprendre les facteurs sanitaires de vulnérabilité afin de proposer des pistes de réflexion pour un futur projet. Cette évaluation qualitative a été réalisée par l’Unité d’évaluation de MSF à Vienne. Elle a été menée dans les cinq (5) communes de la ville de Conakry entre août et septembre 2012. Les recommandations et le rapport final sont présentés en octobre 2012.

Alena KOSCALOVA and Marianne VIOT
01/10/2012

En juin 2009, une évaluation finale des 3 années de projet de MSF-CH (2005 à 2008) à Dabola en Guinée a été menée afin (i) d’en documenter les stratégies et (ii) d’en faire une analyse critique en termes d’accès auxsoins, de perception, de durabilité et d’impact.

SCAVACO
23/12/2009

In June 2009, after three years of the project by MSF-CH (2005 to 2008) in Dabola, Guinea, a final evaluation was conducted with the objective to (i) document the project’s strategies and (ii) undertake a critical analysisof the project regarding access to health care, perception, sustainability and impact.

Dr. Sophie Odermatt-Biays
03/09/2009

 

French report. MSF launched a project in Mali in September 2007 to treat Vesicovaginal fistula (VVF) which continued until January 2008. This cost analysis study was conducted in response to concerns about the high costs of the surgical procedure.

Please note: this report is not available online. Please email Evaluations.Sweden@lakareutangranser.se to request access.
 

Guillaume Jouquet
02/04/2009

Médecins Sans Frontières has been running HIV/AIDS treatment programmes since 2001. As national systems scaled up capacity, MSF began to hand over HIV projects in 2005. Variable experience with handover and internal debates about MSF responsibility to patients led OCG to propose an evaluation of the handover process, to learn from experience and inform policy and practice. A qualitative review was carried out through interviews, case studies in Cameroon and Laos, and review of other vertical and integrated HIV projects.

Dr. Rosamund Lewis and Dr. PehrOlov Pehrson
01/01/2009

French report. Le projet initial de MSF à Bongor était d'assurer la fonctionnalité correcte d'un centre de formation de Bongor pour la formation des médecins généralistes en chirurgie de base. Une des difficultés quant au déroulement harmonieux du projet était d'éviter d'avoir un service de chirurgie de haute qualité au sein de l'hôpital avec à côté des services de médecine et de pédiatrie connaissant de grandes difficultés et une mauvaise prise en charge des malades.

Guillaume Jouquet
01/03/2007

Pages