Photos: 

Some evaluation reports are public and can be downloaded from this website, while others are restricted to MSF users and can only be accessed via Tukul. This limitation is mainly due to the sensitive nature of the operational contexts and the resulting content. However, there are internal discussions about making all evaluation reports publicly searchable. If you are an MSF association member, reports are made available on various associate platforms such as www.insideOCB.com.

Country/Region

The hand over of MSF-F Phnom Penh HIV project is a complex process. This HIV cohort is the biggest of MSF OCP to be handed over so far and the hand over is almost directly done to the national health authorities, NGO partners having been identified only for minor parts of the project. In the first part of the report, a narrative description and an evaluation of the main technical aspects of the handover process are presented.

Cristina Orlandini
01/04/2010

En juin 2009, une évaluation finale des 3 années de projet de MSF-CH (2005 à 2008) à Dabola en Guinée a été menée afin (i) d’en documenter les stratégies et (ii) d’en faire une analyse critique en termes d’accès auxsoins, de perception, de durabilité et d’impact.

SCAVACO
23/12/2009

In September 2009, MSF carried out an assessment of two of its former projects in Karuzi (OCB) and Kinyinya (OCA), Burundi. These two projects were handed over to MOH in 2007 with significant investment from MSF in the handover processes. Following reports of the breakdown of healthcare after MSF’s departure and criticism on the way the handover of these two projects was managed, MSF wanted to assess the current situation in the two sites and document which, if any, handover strategies were successful and led to the continuation of MSF activities.

Frédérique Ponsar and Annie Désilets
27/11/2009

In June 2009, after three years of the project by MSF-CH (2005 to 2008) in Dabola, Guinea, a final evaluation was conducted with the objective to (i) document the project’s strategies and (ii) undertake a critical analysisof the project regarding access to health care, perception, sustainability and impact.

Dr. Sophie Odermatt-Biays
03/09/2009

Médecins Sans Frontières has been running HIV/AIDS treatment programmes since 2001. As national systems scaled up capacity, MSF began to hand over HIV projects in 2005. Variable experience with handover and internal debates about MSF responsibility to patients led OCG to propose an evaluation of the handover process, to learn from experience and inform policy and practice. A qualitative review was carried out through interviews, case studies in Cameroon and Laos, and review of other vertical and integrated HIV projects.

Dr. Rosamund Lewis and Dr. PehrOlov Pehrson
01/01/2009

Internal report An Ebola outbreak was declared in Uganda on 29th of November 2007. An MSF Intervention took place between 1st of December 2007 and 18th January 2008. This report summarises, after general issues, the main points on intersection coordination, coordination with other/external actors, human resources management, expat health and project set up.

admin
09/06/2008

MSF-CH has been working in Gulu since 2003, supporting different health structures and running a shelter for “night commuters”. This evaluation was initiated by the desk, mainly because the progress of this project was slow and there were doubts whether it addresses real needs. Hence the general objective of the evaluation was to review the intervention in Gulu and determine its Relevance, Effectiveness and Efficiency. In addition Perception, Co-ordination and Exit strategies were looked at. The evaluation was carried out between September and October 2005.

admin
01/10/2005

Pages