Photos: 

Some evaluation reports are public and can be downloaded from this website, while others are restricted to MSF users and can only be accessed via Tukul. This limitation is mainly due to the sensitive nature of the operational contexts and the resulting content. However, there are internal discussions about making all evaluation reports publicly searchable. If you are an MSF association member, reports are made available on various associate platforms such as www.insideOCB.com.

Country/Region

Reviewed Interventions This chapter provides an overview of the contexts and MSF interventions of all the reviewed interventions (DRC, Cameroun, Djibouti, Iraq, South Africa and Pakistan).

Alena Koscalova, Elena Lucchi
16/12/2010

This study was carried out in order to critically appraise the impact of the MSF-CH health care program on a local society in chronic conflict. The overall aim of this study was to understand critical issues in the implementation of the program, and to draw lessons for the future program planning in Marial Lou as well as for similar interventions elsewhere.

Sabine Kampmueller
19/11/2010

The purpose of this evaluation was to review the experience in needs assessment and response to displacement in open settings. For the evaluation process, six interventions were reviewed: MSF Operational Centre Geneva (OCG) interventions in the Democratic Republic of Congo (DRC) (Haut-Uélé), Djibouti, Cameroon and Iraq; Operational Centre Brussels (OCB) interventions in South Africa and Pakistan; and partial review of Operational Centre Paris (OCP) experience in Pakistan.

Alena Koscalova and Elena Lucchi
01/06/2010

In the beginning of 2006, OCB opened a hospital project in Bor, in Jonglei state, South Sudan. This was a little over a year after the CPA (the Comprehensive Peace Agreement) was signed between SPLA and GoS The project soon became one of the highest resources consuming project in an unstable environment. In mid 2008 the decision was taken to close the project. OCB considered that they were unable to manage the hospital. It was not thought that the project in the current format was sustainable security wise, given a number of factors.

Anneli Eriksson
14/01/2010

The overall objective of the evaluation is to identify and describe factors and issues to consider when planning implementation or continuation of Remote Control Programmes (RCPs) as an alternative to cancelling Médecins Sans Frontières (MSF) programme implementation in a particular region/ country.

Martin Braaksma and Mzia Turashvili
01/06/2009

Médecins Sans Frontières has been running HIV/AIDS treatment programmes since 2001. As national systems scaled up capacity, MSF began to hand over HIV projects in 2005. Variable experience with handover and internal debates about MSF responsibility to patients led OCG to propose an evaluation of the handover process, to learn from experience and inform policy and practice. A qualitative review was carried out through interviews, case studies in Cameroon and Laos, and review of other vertical and integrated HIV projects.

Dr. Rosamund Lewis and Dr. PehrOlov Pehrson
01/01/2009

MSF-CH’s project for street children in Tegucigalpa started in 2005 and has been gradually adapted and revised to focus on the actual target population: children and youth sleeping permanently or temporarily in the streets who are more at risk to suffer from violence. Between the end of September and mid-October a visit was done to evaluate the programme of MSF-Switzerland for street children in Tegucigalpa, Honduras. The main objectives of the visit were: 1.

Carmen Rodríguez and Theo Kreuzen
01/11/2007

The evaluation unit in Vienna (MSF-Austria) was requested to analyse the different nutritional strategies implemented in Marial Lou over the past years (2003 – 2006) in terms of appropriateness, effectiveness and efficiency, and, to identify recommendations for future similar contexts. After presenting the first results, the evaluator was requested to extend the analysis of outcome data to those of the Niger nutrition program 2005 and 2006, for better comparison of results.

Anita Sackl
01/09/2007

MSF had been working in Honduras and Guatemala in HIV prevention and care of people living with HIV and AIDS for several years before ART projects were started in 2001. In 2005 the projects were handed over to the National AIDS Programme, though MSF-CH kept some staff in both countries to monitor progress. This evaluation was planned a year and a half after handing over the project, to document the perception of people regarding lessons learnt; whether the project was handed over properly; and the quality of care for people living HIV.

SCAVACO
01/02/2007

Pages