Photos: 

Some evaluation reports are public and can be downloaded from this website, while others are restricted to MSF users and can only be accessed via Tukul. This limitation is mainly due to the sensitive nature of the operational contexts and the resulting content. However, there are internal discussions about making all evaluation reports publicly searchable. If you are an MSF association member, reports are made available on various associate platforms such as www.insideOCB.com.

Country/Region

The overall objective of the evaluation is to identify and describe factors and issues to consider when planning implementation or continuation of Remote Control Programmes (RCPs) as an alternative to cancelling Médecins Sans Frontières (MSF) programme implementation in a particular region/ country.

Martin Braaksma and Mzia Turashvili
01/06/2009

Cyclone Nargis was a strong tropical cyclone that caused the worst natural disaster in the recorded history of Myanmar. An MSF intervention started 72 hours after the disaster with two teams, one in Bogalay and one in Pyapon. Due to political restrictions the real operational activities only started 10 days after. MSF-CH wanted to capture the lessons learned out of this major response that was considered a successful intervention.

admin
13/01/2009

After 15 years of presence in Myanmar, an evaluation was conducted to highlight some of the challenges relating to the context and the lessons learned

Dan Sermand and Dr Jean-Clément Cabrol
20/09/2008

Internal report An Ebola outbreak was declared in Uganda on 29th of November 2007. An MSF Intervention took place between 1st of December 2007 and 18th January 2008. This report summarises, after general issues, the main points on intersection coordination, coordination with other/external actors, human resources management, expat health and project set up.

admin
09/06/2008

MSF-CH has been working in Gulu since 2003, supporting different health structures and running a shelter for “night commuters”. This evaluation was initiated by the desk, mainly because the progress of this project was slow and there were doubts whether it addresses real needs. Hence the general objective of the evaluation was to review the intervention in Gulu and determine its Relevance, Effectiveness and Efficiency. In addition Perception, Co-ordination and Exit strategies were looked at. The evaluation was carried out between September and October 2005.

admin
01/10/2005

Pages