Photos: 

Some evaluation reports are public and can be downloaded from this website, while others are restricted to MSF users and can only be accessed via Tukul. This limitation is mainly due to the sensitive nature of the operational contexts and the resulting content. However, there are internal discussions about making all evaluation reports publicly searchable. If you are an MSF association member, reports are made available on various associate platforms such as www.insideOCB.com.

Topic

Country/Region

In the beginning of 2006, OCB opened a hospital project in Bor, in Jonglei state, South Sudan. This was a little over a year after the CPA (the Comprehensive Peace Agreement) was signed between SPLA and GoS The project soon became one of the highest resources consuming project in an unstable environment. In mid 2008 the decision was taken to close the project. OCB considered that they were unable to manage the hospital. It was not thought that the project in the current format was sustainable security wise, given a number of factors.

Anneli Eriksson
14/01/2010

Médecins Sans Frontières has been running HIV/AIDS treatment programmes since 2001. As national systems scaled up capacity, MSF began to hand over HIV projects in 2005. Variable experience with handover and internal debates about MSF responsibility to patients led OCG to propose an evaluation of the handover process, to learn from experience and inform policy and practice. A qualitative review was carried out through interviews, case studies in Cameroon and Laos, and review of other vertical and integrated HIV projects.

Dr. Rosamund Lewis and Dr. PehrOlov Pehrson
01/01/2009

Internal report An Ebola outbreak was declared in Uganda on 29th of November 2007. An MSF Intervention took place between 1st of December 2007 and 18th January 2008. This report summarises, after general issues, the main points on intersection coordination, coordination with other/external actors, human resources management, expat health and project set up.

admin
09/06/2008

The evaluation unit in Vienna (MSF-Austria) was requested to analyse the different nutritional strategies implemented in Marial Lou over the past years (2003 – 2006) in terms of appropriateness, effectiveness and efficiency, and, to identify recommendations for future similar contexts. After presenting the first results, the evaluator was requested to extend the analysis of outcome data to those of the Niger nutrition program 2005 and 2006, for better comparison of results.

Anita Sackl
01/09/2007

French report. Le projet initial de MSF à Bongor était d'assurer la fonctionnalité correcte d'un centre de formation de Bongor pour la formation des médecins généralistes en chirurgie de base. Une des difficultés quant au déroulement harmonieux du projet était d'éviter d'avoir un service de chirurgie de haute qualité au sein de l'hôpital avec à côté des services de médecine et de pédiatrie connaissant de grandes difficultés et une mauvaise prise en charge des malades.

Guillaume Jouquet
01/03/2007

MSF-CH did rehabilitate the Mundari hospital in Kajo Keji County (KKC) and did support the existing OPD from September 1997 onward. Environmental- and political factors and an estimated high HIV prevalence did lead to the decision to implement the first time an integrated HIV/AIDS component (2005). Towards the end of the project it was decided that the handover process, as well as the HIV integrated approach and the capacity build during the last 9 years of presence in KKC should be evaluated.

SCAVACO
01/12/2006

MSF-CH has been working in Gulu since 2003, supporting different health structures and running a shelter for “night commuters”. This evaluation was initiated by the desk, mainly because the progress of this project was slow and there were doubts whether it addresses real needs. Hence the general objective of the evaluation was to review the intervention in Gulu and determine its Relevance, Effectiveness and Efficiency. In addition Perception, Co-ordination and Exit strategies were looked at. The evaluation was carried out between September and October 2005.

admin
01/10/2005

Pages