Some evaluation reports are public and can be downloaded from this website, while others are restricted to MSF users and can only be accessed via Tukul. This limitation is mainly due to the sensitive nature of the operational contexts and the resulting content. However, there are internal discussions about making all evaluation reports publicly searchable. If you are an MSF association member, reports are made available on various associate platforms such as www.insideOCB.com.

Topic

Country/Region

Following the earthquake in 2010 and the emergency response that ensued, MSF-OCG took the decision to invest in a hospital in the Leogane area that was for several years the biggest hospital managed by MSF-OCG. Given that for the last three years this was the only MSF-OCG project in the country, that the capital is located only two hours from the hospital and that there is a strategic ambition within MSF-OCG to review mission set-ups, OCG and the field teams determined that 2013 was an opportune time to review the Haiti mission.

Annie Desilets
01/11/2014

This evaluation finds that the Kibera Project has had a tremendous impact at the patient, community and policy level. Additionally, the report points out that the decentralisation of health services at the primary health care level has been a core tenet of the project as it has evolved from a vertical HIV/AIDS programme to a multi-clinic operation offering comprehensive health care.

Samuel Hall Consulting on behalf of Stockholm Evaluation Unit
01/11/2013

This evaluation contributes to the debate around the OCB Martissant intervention following the proposed closure and resulting decision to scale down in 2013. The report concludes that the context remains similar to that of the beginning therefore the intervention is still as relevant as it was in 2006 however the evaluation questions the suitability of OCB's country wide strategy in Haiti, urging a focus towards the most vulnerable and marginalised urban populations, rather than towards the general needs of the population.

Stockholm Evaluation Unit
01/10/2013

This evaluation contributes to the debate around the OCB Martissant intervention following the proposed closure and resulting decision to scale down in 2013. The report concludes that the context remains similar to that of the beginning therefore the intervention is still as relevant as it was in 2006 however the evaluation questions the suitability of OCB's country wide strategy in Haiti, urging a focus towards the most vulnerable and marginalised urban populations, rather than towards the general needs of the population.

Stockholm Evaluation Unit
23/09/2013

In the last decade, while facing increasingly complex “projects”, MSF-OCP has chosen to add means to improve its interventions. This results in the actual growth syndrome of MSF-OCP HQ departments, which is also significantly impacting country coordination (CC) set-ups and means. New scenarios should be tested, notably for mono-projects (to revise), the idea being to reduce CC set-ups whenever possible. Resources' analyses highlight the importance of competent persons to follow (coordinators & key positions), including PCs, with a clearer career path.

Marie‐Laure Le Coconnier
01/08/2013

The evaluation of National Emergency Pools MSF-OCP in Nigeria, DRC, and Chad, show variable investments and interest by missions. In certain cases there is a true added value that is recognised by teams prepared and backed up by MSF Coordinations and Paris HQs (with or without the E-desk intervention). After several years of functionning, a clearer frame has to be defined: follow up of carrier path, ad-hoc trainings, technical back up notably for emergency interventions. Periods away from emegencies should allow to improve the emergency response set ups with NEPs.

VBROWN
06/12/2012

L'évaluation des Pool d'Urgence Nationaux MSF-OCP au Nigeria, en RDC, et au Tchad montre des investissements et des intérêts variables selon les missions. Dans certains cas il existe une véritable valeur ajoutée qui est reconnue avec des équipes préparées et épaulées par les Coordinations et le Siège de Paris (ceci avec ou sans intervention du Desk d'Urgence). Après plusieurs années de fonctionnement, un cadre mieux défini reste à établir : suivi de parcours, formations ad-hoc, appui technique en particulier lors d'interventions sur les urgences.

VBROWN
25/10/2012

This report summarises the key lessons learned from MSF's cholera interventions in Zambia 2004, 2006, 2008, 2010 (OCBA), Guinea Bissau 2005-2008 (OCBA), Juba 2006 (OCBA), Haiti 2010-2011 (OCBA), Angola 2006 (OCB, OCA, OCBA), Zimbabwe 2009 (OCB, OCA, OCBA)

M Iscla
09/05/2012

After the 12 January 2010 earthquake in Port-au-Prince, 4 MSF sections (OCG, OCA, OCP and OCB) decided to build container hospitals to respond to the health care needs (including Léogâne). All of these prefabricated structures, though varying in quality, were unique in that they were partially or completely built from modular containers (with different architectural designs). Construction was done by subcontractors, MSF teams trained in construction, or a combination of the two.

Monique Lathelize, Marie-Laure Le Coconnier, Julien Bégou
02/02/2012